Pipe and Well Abandonment
The abandonment of pipes and wells typically involves filling them with materials to prevent potential environmental contamination, collapse, or other hazards. Here's a general overview of the process:
Using our Specialized Pour Foam, Spray Guard is a able to fill wells and pipes without an issue
Pipe Abandonment:
Abandonment Procedure:
Inject foam into the abandon pipe.
Ensure that the material reaches the bottom and completely fills the pipe.
Allow the material to set and cure, creating a stable and impermeable barrier within the pipe.
Well Abandonment:
Well Closure Assessment:
Assess the well's structure and condition.
Determine the appropriate abandonment method based on regulatory requirements and site conditions.
Abandonment Procedure:
Pump the foam into the wellbore to fill the entire void.
Ensure that the material reaches the bottom of the well and fills any open spaces in the surrounding formations.
Allow the material to set and cure, forming a barrier that isolates the well from surrounding aquifers.
Surface Sealing:
Seal the wellhead with an impermeable material to prevent surface water infiltration.